发明名称 建設機械の制御装置
摘要 <P>PROBLEM TO BE SOLVED: To add regeneration switching means c to a two-speed switching control valve 4 for controlling a boom cylinder BC to integrate them, thereby achieving downsizing and space-saving. <P>SOLUTION: In a first circuit system connected to a first main pump MP1, regeneration switching means c is added to a two-speed switching control valve 4 of a boom cylinder BC which is a switching control valve with less number of switching positions than other switching control valves, to integrate the two-speed switching control valve 4 and the regeneration switching means c. And, during no operation of the boom cylinder BC, the regeneration switching means c is also maintained in an open state. <P>COPYRIGHT: (C)2012,JPO&INPIT
申请公布号 JP5872170(B2) 申请公布日期 2016.03.01
申请号 JP20110031023 申请日期 2011.02.16
申请人 KYB株式会社 发明人 川崎 治彦;江川 祐弘
分类号 E02F9/22;E02F9/20;F15B21/14 主分类号 E02F9/22
代理机构 代理人
主权项
地址