发明名称 Method for steam assisted gravity drainage with pressure differential injection
摘要 A process for recovering hydrocarbons with steam assisted gravity drainage (SAGD) with pressure differential injection. Methods for producing hydrocarbons in a subterranean formation having at least two well pairs include installing a highest pressure well pair in the subterranean formation; installing a lowest pressure well pair in the subterranean formation; applying a pressure differential across the highest pressure well pair and the lowest pressure well pair; injecting steam into the first injection well to form a first steam chamber; injecting steam into the final injection well to form an adjacent steam chamber; monitoring the steam chambers until they merge into a final steam chamber; ceasing the flow of steam into the first injection well; and injecting steam into the final injection well to maintain the final steam chamber.
申请公布号 US9267367(B2) 申请公布日期 2016.02.23
申请号 US201213432954 申请日期 2012.03.28
申请人 ConocoPhillips Company 发明人 Wheeler Thomas J.;Sultenfuss Daniel R.
分类号 E21B43/24;E21B43/16;E21B36/00 主分类号 E21B43/24
代理机构 ConocoPhillips Company 代理人 ConocoPhillips Company
主权项 1. A method for producing hydrocarbons in a subterranean formation having at least two well pairs comprising: a. installing a highest pressure well pair in the subterranean formation, wherein the highest pressure well pair includes a first injection well and a first production well, wherein the pressure differential across the first injection well and an adjacent injection well is at least 200 kPa; b. installing a lowest pressure well pair in the subterranean formation, wherein the lowest pressure well pair includes a final injection well and a final production well, wherein the pressure differential across the final injection well and an adjacent injection well is at least 200 kPa; c. applying a considerable pressure differential across the highest pressure well pair and the lowest pressure well pair, wherein the considerable pressure differential across the highest pressure and lowest pressure well pairs is at least 200 kPa; d. injecting steam into the first injection well to form a first steam chamber; e. injecting steam into the final injection well to form an adjacent steam chamber; f. monitoring the steam chambers until they merge into a final steam chamber; g. ceasing the flow of steam into the first injection well; and h. injecting steam into the final injection well to maintain the final steam chamber.
地址 Houston TX US