摘要 |
The method involves prefabricating four modules (2-5) using watertight reinforced concrete, where each module is obtained by molding. An inner completion surface (2a) is provided to smooth respective electric and mechanical accessories. The modules are connected with each other relative to an armed foundation raft (9) to run on a spot through vertical mechanical assembly units and horizontal units. A swimming pool (1) is obtained without internal seal coating. An independent claim is also included for a water basin. |