发明名称 |
施工中トンネルの発電方法および施工中トンネルの発電システム |
摘要 |
<P>PROBLEM TO BE SOLVED: To provide a power generation method for a tunnel under construction and a power generation system for the same capable of saving power consumption of equipment in the tunnel under construction. <P>SOLUTION: Turbid water discharged in association with construction of a tunnel 12 is treated with a turbid water treatment facility 18 and stored in a discharge tank 1806 as treatment water. The treatment water in the discharge tank 1806 is transferred to a pipe conduit 24 with a second submerged pump 25. The treatment water transferred to the pipe conduit 24 flows through the pipe conduit 24 toward a discharge port 2404 by pressure of the second submerged pump 25 as well as a water head difference of the pipe conduit 24. A waterwheel 2602 of a power generation unit 26 is rotationally driven by the treatment water sprayed through the discharge port 2404 (a spray nozzle 2404A) to enable a generator 2606 to generate power. The generated power is supplied to respective lighting equipment 32 from a distribution board 28 through a cable 38 and thereby activating the lighting equipment 32 to illuminate the turbid water treatment facility 18. <P>COPYRIGHT: (C)2013,JPO&INPIT |
申请公布号 |
JP5856444(B2) |
申请公布日期 |
2016.02.09 |
申请号 |
JP20110248703 |
申请日期 |
2011.11.14 |
申请人 |
株式会社フジタ |
发明人 |
松葉 稔晴;川上 勝彦;浅沼 廉樹;土屋 敏郎;中村 多聞;藤多 真也;小笠原 和久;石坂 仁 |
分类号 |
E21F17/00;C02F1/00;F03B17/06 |
主分类号 |
E21F17/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|