发明名称 |
Multi-interval dispatch method for enabling dispatchers in power grid control centers to manage changes |
摘要 |
A method is provided that enables dispatchers in power grid control centers to manage changes by applying multi-interval dispatch. A multi-stage resource scheduling engine and a comprehensive operating plan are used. Multiple system parameter scenarios are coordinated. |
申请公布号 |
US9251479(B2) |
申请公布日期 |
2016.02.02 |
申请号 |
US201012830019 |
申请日期 |
2010.07.02 |
申请人 |
General Electric Technology GmbH |
发明人 |
Sun David;Cheung Kwok;Wang Xing;Chiu But-Chung;Xiao Ying |
分类号 |
G06Q99/00;G06Q10/06;G06Q50/06;H02J3/00 |
主分类号 |
G06Q99/00 |
代理机构 |
Amin, Turocy & Watson, LLP |
代理人 |
Amin, Turocy & Watson, LLP |
主权项 |
1. A method comprising:
generating a supply of energy by a power grid device of a power grid and dispatching the supply of energy by the power grid device based on at least one multi-level dispatch operation of the power grid, wherein the power grid device comprises a processor that facilitates deployment of a comprehensive operating plan; applying, by the power grid device, an action defined by the comprehensive operating plan as a function of operating plan data stored by a data store database representing an operating plan to provide a multi-interval scheduling solution that allocates operational resources of the power grid according to a schedule of the power grid to generate the supply of energy and dispatch the supply of energy by the power grid device; associating, by the power grid device, a multi-stage resource engine with of at least one scheduler engine corresponding to respective look-ahead periods, and in accordance with the comprehensive operating plan; and capturing, by the power grid device, scheduling data for storage by the data store, wherein the scheduling data corresponds to a unified scheduling system integrated with the at least one schedule engine in accordance with the comprehensive operating plan; and closing, by the power grid device, a gap between day ahead scheduling that schedules a commitment of power grid resources for a day ahead of an identified day, a unit commitment decision that manages peak and valley demands of, the power grid, and real time economic dispatch sequences that deploy power grid resources at different time periods. |
地址 |
Baden CH |