摘要 |
PROBLEM TO BE SOLVED: To make it easy to grasp the effects of weather in construction business.SOLUTION: A process display device acquires, from a weather forecast information provision system, weather forecast information at a place where construction is to be carried out (step S22). Next, construction element ID and work period correlated to the construction ID of the construction to be carried out are acquired from a construction element management table (step S23), and the weather condition corresponding to the construction element ID and the content of notification are acquired from a construction element master table (step S24). Determination is made on the basis of the weather forecast information and the work period and weather condition corresponding to the construction element included in the construction to be carried out, as to whether the weather forecast information and the weather condition match, and, when there is a period in which the weather forecast information and the weather condition match (Yes in step S25), a warning is displayed for the relevant period of a construction element bar corresponding to the construction element to be warned and a construction bar corresponding to construction to which the construction element to be warned belongs (step S26). |