摘要 |
A sand control completion system comprises: (A) a first flow rate regulator, wherein the first flow rate regulator is positioned in a first interval of a wellbore, wherein the first flow rate regulator is part of a first sand Control assembly; and (B) a second flow rate regulator, wherein the second flow rate regulator is positioned in a second interval of the wellbore, wherein the second flow rate regulator is part of a second sand control assembly, wherein a reservoir fluid is caused or allowed to simultaneously flow through the first and second flow rate regulators into a tubing string, wherein the reservoir fluid is commingled into a single fluid stream within the tubing string. A method of using the sand control completion system to simultaneously produce a reservoir fluid from more than one zone of a subterranean formation is also provided. |