摘要 |
PROBLEM TO BE SOLVED: To provide a dowels pile superior in load bearing ability against internal force.SOLUTION: The dowels pile has plural holes formed in the side wall of a pipe member. Plural rod-like members are disposed penetrating through the holes protruding inward the pipe member. The inside of the pipe member with the rod-like members disposed is filled with a time-curable material. The dowels pile is filled with the time-curable material inside the pipe member so that the time-curable material enters into the holes integrally with the rod-like members. The dowels pile is formed with holes in the entire face of the side wall of the pipe member at predetermined intervals. With this arrangement, the dowels pile shares an internal force which is generated by an external force applied to the dowels pile 1, and concrete member is prevented from being broken resulting in an improved durability. |