发明名称 WASTE-PROCESSING APPARATUS
摘要 A waste treatment facility 100 is constructed in vicinity of a cement production facility 200. This comprises: a gasification furnace 1 for gasifying waste to generate a pyrolysis gas; and a gas transport line 6 for transporting the pyrolysis gas generated in the gasification furnace 1 to a calciner 20 or the like in the cement production facility 200 while containing entrained char and ash, The flow rate of the pyrolysis gas from the gasification furnace 1 is limited to a level below a predetermined flow rate ratio over the flow rate of the exhaust gas from the calciner 20 to reduce the fluctuation of the temperature in the calciner 20, so that the stability in the operation of the cement production facility 200 is ensured. The pyrolysis gas may be introduced to the calciner 20 from the gas transport line 6 so as to swirl along the peripheral wall section 23.
申请公布号 EP2631222(A4) 申请公布日期 2016.01.06
申请号 EP20110833864 申请日期 2011.10.20
申请人 KAWASAKI JUKOGYO KABUSHIKI KAISHA;ANHUI CONCH GROUP COMPANY LIMITED;ANHUI CONCH KAWASAKI ENGINEERING COMPANY LIMITED;BUILDING MATERIAL DESIGN AND RESEARCH INSTITUTE OF ANHUI CONCH;ANHUI CONCH KAWASAKI ENERGY CONSERVATION EQUIPMENT MANUFACTURING COMPANY LIMITED;ANHUI TONGLING CONCH CEMENT COMPANY LIMITED 发明人 GUO, WENSAN;LI, SHUNAN;HE, CHENGFA;ZHANG, CHANGLE;LI, DAMING;LI, QUNFENG;WANG, KECHUN;LI, ZHAOHUI;XIAO, JIEYU;CHENG, XIAOBING;YANG, CHANGQING;HAYASHI, TOSHIKAZU;INOUE, EIJI;KATAHATA, TADASHI;KATOH, SADAFUMI;ICHITANI, NOBORU;HASHIMOTO, ATSUSHI;TOSHIHIRO, JUN
分类号 C04B7/24;C04B7/43 主分类号 C04B7/24
代理机构 代理人
主权项
地址