发明名称 |
NATM TUNNEL STRUCTURE AND CONSTRUCTION METHOD THEREOF |
摘要 |
The present invention provides an NATM tunnel construction structure having an invert reinforcement structure, and a construction method thereof. According to the present invention, it is possible to secure a reinforcement structure for steel ribs through support fixtures and support struts; is possible to shorten a required construction time; and is possible to secure stability and safety of the overall structure by suppressing a crown settlement and a convergence displacement. The NATM tunnel construction structure comprises: steel ribs which are separately installed along a longitudinal direction of an excavated tunnel face; supports struts connected across in a transverse direction at a predetermined height from both ends of the steel ribs; supports members which have one end fixated to each of the end portions of the support struts and an other end fixated to the steel ribs; and a plug member laid to the support struts. |
申请公布号 |
KR20160000792(A) |
申请公布日期 |
2016.01.05 |
申请号 |
KR20140078465 |
申请日期 |
2014.06.25 |
申请人 |
POSCO ENGINEERING & CONSTRUCTION CO., LTD. |
发明人 |
KIM, SANG JIN;BAE, HO SUB;SHIN, DONG KAG |
分类号 |
E21D11/14;E21D11/10;E21D11/18 |
主分类号 |
E21D11/14 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|