摘要 |
The invention relates to a wind turbine with a foundation (210) and a tower (102) which is placed on the foundation (210). The foundation (210) has a foundation plate (211) below a ground level and a foundation base (212) on the foundation plate (211) above the ground level. A tensioning cable terminal (213, 214) with a plurality of bores (213a, 214a) for receiving tensioning cables (230) is provided on the foundation base (212), and the tensioning cables (230) are clamped to a lower face (213b, 214b) of the terminal (213, 214) by means of a tensioning cable head (240). The foundation plate (211) and the foundation base (212) are cast in one piece from an in-situ concrete. |