摘要 |
PROBLEM TO BE SOLVED: To determine an appropriate supply water temperature even when the order of start-up of heat source equipment changes.SOLUTION: A model switch part 15 selects an estimation model corresponding to the order of start-up from a model accumulation part 16 on the basis of a designated start-up order. An appropriate supply water temperature determination part 18 determines an appropriate supply water temperature from a control past record newly input on the basis of the estimation model selected by the model switch part in a supply water temperature control. |