发明名称 METHOD FOR DETERMINING TIME OF DEMOLDING CONCRETE
摘要 PROBLEM TO BE SOLVED: To provide a method for determining time of demolding the concrete that simply and accurately estimates the strength when demolding the concrete of a young material age on the way of curing like the coating concrete of a mountain tunnel. SOLUTION: An internal temperature is measured at the end of the crown part 3 of a centering when casting the coating concrete 2 of a tunnel 1 (step 1), a cubic test piece and a columnar test piece, both of which includes the same material of on-the-spot concrete, are made to be aged in a thermostatic ageing chamber to which a measuring temperature is applied (step 2), the measurement of the degree of repulsion of the cubic test piece due to a pendulum type hammer tester and the uniaxial compression test of the columnar test piece are performed at the same time to obtain the degree of repulsion and a uniaxial compression strength curve (step 3) in an elapse of 16 to 24 hrs, the form of the end is partially detached and the degree of repulsion of the on-the-spot concrete is measured by the pendulum type hammer tester and the compression strength of the on-the-spot concrete is estimated using the curve (step 4) and, if the on-the-spot concrete reaches predetermined demoldable strength, the whole of the centering is lowered to demold the concrete. COPYRIGHT: (C)2009,JPO&INPIT
申请公布号 JP2009002721(A) 申请公布日期 2009.01.08
申请号 JP20070162137 申请日期 2007.06.20
申请人 OHMOTO GUMI CO LTD 发明人 SUZUKI SHOJI;KAWASAKI HAJIME;TAKATORI HIDEKAZU
分类号 G01N3/00;E04G21/02;E21D11/10;G01N3/08;G01N3/52;G01N33/38 主分类号 G01N3/00
代理机构 代理人
主权项
地址