发明名称 ROUTE BURIAL PREVENTING METHOD AND PORT FACILITY PREVENTING BURIAL
摘要 PROBLEM TO BE SOLVED: To attain efficiency in maintaining and dredging a port and to efficiently carry out dredging of a route by preventing accumulation of sediment in the route, and accumulating sand and silt separately. SOLUTION: The bottom of the route 1 is provided with dug-in parts 4 at suitable spaces, and submerged breakwaters 2 are provided along the side of the route 1. The top end 21 of the submerged breakwater 2 is set to a depth that allows a small ship to pass through with allowance even at low tide, and a dug-in part 3 is constructed near the submerged breakwater 2. A partition 31 is provided at the center part of the dug-in part 3 or on the submerged breakwater 2 side, and the partition partitions the accumulated places of sand and silt. COPYRIGHT: (C)2008,JPO&INPIT
申请公布号 JP2008223446(A) 申请公布日期 2008.09.25
申请号 JP20070067902 申请日期 2007.03.16
申请人 YAMAGUCHI UNIV 发明人 HATANO KESAYOSHI
分类号 E02B3/06;E02B3/14 主分类号 E02B3/06
代理机构 代理人
主权项
地址