发明名称 PROCESS OF WORKING ROAD LIGHTING WITH SEVERAL EARTH CONNECTION
摘要 PURPOSE: An installation method of a street light foundation to enable multi-functional consecutive grounding using a projected fixed grounding copperplate is provided to prevent the performance reduction of earth buried in a concrete block. CONSTITUTION: An installation method of a street light foundation to enable multi-functional consecutive grounding comprises conduit tubes(20,20') through which an electric wire for supply(60), a conductor for supply(10), an electric wire for discharge(60'), and a conductor for discharge(10') pass together, a fixed grounding tube(22) through which a fixed grounding wire(12) passes, a projected fixed grounding copperplate(70) which is connected to the lower part of the fixed grounding wire and projected from the bottom of a concrete block(40), and a ground connection tube(30) projected from the top of the concrete block and connected to the conductors and the fixed grounding wire.
申请公布号 KR100948039(B1) 申请公布日期 2010.03.19
申请号 KR20090039287 申请日期 2009.05.06
申请人 SHINHANBIT. CO., LTD. 发明人 KIM, MYOUNG SUNG
分类号 E02D27/42;E04H12/22;H01R4/66 主分类号 E02D27/42
代理机构 代理人
主权项
地址