发明名称 SWABBING METHOD WITH WELL MONITORING
摘要 FIELD: oil and gas industry. ^ SUBSTANCE: tubing strings are lowered to the well. Liquid is removed from the well via the above tubing string. Packer and instruments are installed on anchors. Prior to swabbing, the well string is packered. Central hole at the end of tubing string is closed with a detachable valve. Liquid is removed from tubing string. If necessary, liquid is removed from inter-tube space through the hole made in lower part of that string. In case it is not required to remove liquid from inter-tube space, the tubing string closed with a detachable valve is lowered without adding the liquid to it and with air available in it. Detachable valve is taken out with a grab on the cable, or the well string is unpackered. Examination with instruments is performed and filter is cleaned at smoothly ascending fluid flow. Bottomhole pressure of fluid, at which the formation stops working at ascending flow, is approximately equal to the value of bottomhole pressure, at which the formation begins working at decrease of the well liquid level. Installation depth of bottomhole pump is calculated. ^ EFFECT: increasing swabbing depth, reducing the time required for it, smooth change of level and pressure of the well liquid, reliable and accurate recording of the processes performed in the well.
申请公布号 RU2388909(C1) 申请公布日期 2010.05.10
申请号 RU20080140265 申请日期 2008.10.09
申请人 OTKRYTOE AKTSIONERNOE OBSHCHESTVO "GAZPROMNEFT'-NOJABR'SKNEFTEGAZGEOFIZIKA" 发明人 PASECHNIK MIKHAIL PETROVICH;KOVALEV VALERIJ IVANOVICH;BORISOV JURIJ SERGEEVICH;BELOUS VIKTOR BORISOVICH;MOLCHANOV EVGENIJ PETROVICH;KORJAKOV ANATOLIJ STEPANOVICH
分类号 E21B47/00;E21B43/25;E21B47/06 主分类号 E21B47/00
代理机构 代理人
主权项
地址