PURPOSE: A method of a project management for a ship production is provided to remove error occurrence according to a manual work by automatically connecting BOM(Bill OF Material)-ITEM and WBS(Work Breakdown Structure) ACTIVITY. CONSTITUTION: An item code is generated and BOM is confirmed(S102). A WBS activity structure is generated(S104). A WBS ACTIVITY code is made and is uploaded(S106). The confirmed BOM and the uploaded WBX ACTIVITY code is automatically connected through connection logic(S110). If ECO is issued, a ECO issuing item is automatically reflected. An error breakdown is outputted.