摘要 |
#CMT# #/CMT# The construction has a sealing in form of a foil, where the foil is fixed to the mountain or to the mountain side construction by anchor. Anchors are provided in the stable mountains. A foil restraint is provided between two fasteners, which are held on the anchors. A spacer is provided with bars, where polyethylene or polypropylene is also utilized. #CMT#USE : #/CMT# Construction for high and civil engineering, particularly tunnel lining or construction of tunnel in a stable mountain. #CMT#ADVANTAGE : #/CMT# The construction has a sealing in form of a foil, where the foil is fixed to the mountain or to the mountain side construction by anchor, where anchors are provided in the stable mountains, and hence ensures improved construction. #CMT#DESCRIPTION OF DRAWINGS : #/CMT# The drawing shows a schematic view of a mountain disruption in a stable mountain. 1 : Mountain disruption 2 : Center axis 3 : Shorcrete layer 4 : Foil layer. |