摘要 |
<p><P>PROBLEM TO BE SOLVED: To provide an air conditioner and an air conditioning system with the air conditioner capable of prolonging the time for stably performing dehumidifying operation by suppressing excess dehumidifying in starting of dehumidifying operation. <P>SOLUTION: A measurement control device 13 as a blowing control means operates an internal air blower 8 at a minimum air blowing amount in operation start in a dehumidifying operation mode, and increases the air blowing amount of the internal air blower 8 in accordance with the dehumidifying state after a lapse of the prescribed time after operation start in the dehumidifying operation mode. <P>COPYRIGHT: (C)2011,JPO&INPIT</p> |