发明名称 |
Onshore-production plant for manufacturing offshore wind energy plant in e.g. port, has heavy load-module transporters provided on running tracks for transporting between intermediate storage facilities if necessary |
摘要 |
The plant (1) has local bracings provided as load-bearing assembly devices. Heavy load-module transporters (4) are provided on running tracks (3) for transporting between individual production stations e.g. first production station for foundation production, second production station for production of a mast i.e. pre-stressed concrete mast, third production station for final assembly and fourth production station (IV) i.e. transfer station, and between intermediate storage facilities if necessary. An independent claim is also included for a method for producing a partly-produced offshore wind energy plant in an onshore production plant. |
申请公布号 |
DE102010002181(B3) |
申请公布日期 |
2011.06.09 |
申请号 |
DE20101002181 |
申请日期 |
2010.02.22 |
申请人 |
ED. ZUEBLIN AG |
发明人 |
WEBER, KLAUS;GLADE, JOACHIM |
分类号 |
E04H12/34;E02D27/52;F03D11/04 |
主分类号 |
E04H12/34 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|