发明名称 SOIL IMPROVEMENT CONSTRUCTION METHOD
摘要 PROBLEM TO BE SOLVED: To provide a soil improvement construction method for allowing a worker to evaluate the effect of restraining ground soil properly in advance, decide a shape and arrangement of rational improving body, and then construct the improving body with reduced cost. SOLUTION: In this soil improving construction method, such improving body 1 that restrains deformation of the ground when receiving load and being deformed is arranged and constructed in the ground. If stress of the soil to be improved in a case of filling construction is increased, the effect of restraining the soil deformation being different depending on the shape and arrangement of the improving body 1 is obtained as a variation of stress of the ground soil by a finite element method in advance. In addition, a variation of strength or rigidity of the ground soil to be caused by the variation of the stress is obtained based on the variation of the stress. After the shape and the arrangement of the improving body tending to increase this variation are decided, this improving body is constructed. COPYRIGHT: (C)2011,JPO&INPIT
申请公布号 JP2011111787(A) 申请公布日期 2011.06.09
申请号 JP20090268256 申请日期 2009.11.26
申请人 NOMU:KK;MIKI JIBAN KANKYO KOGAKU KENKYUSHO:KK;KATO CONSTRUCTION CO LTD 发明人 OKOCHI YASUHIKO;MIKI HIROSHI;MAKINO MASAKI
分类号 E02D3/12;E02D3/08;E02D3/10;E02D17/18 主分类号 E02D3/12
代理机构 代理人
主权项
地址