摘要 |
PROBLEM TO BE SOLVED: To reduce a construction period by conducting a water filling test without waiting for the completion of an outer tank. SOLUTION: Stress which is applied to the outer tank, having a remaining carry-in/carrying-out port, by storing a testing liquid in an inner tank is calculated through simulation, and whether the stress is an allowable value or not is determined. When the stress is within the allowable value, the water filling test is conducted before closing the carry-in/carrying-out port. COPYRIGHT: (C)2011,JPO&INPIT
|