摘要 |
PROBLEM TO BE SOLVED: To provide a floor heating pipe connection structure easy in connection work between a warm water pipe and a branch header.SOLUTION: A base plate 12 is installed to cover a floor hole 3. Branch headers 30, 40 are arranged in a hollow 24 of the base plate 12, and main pipes 1, 2 and warm water pipes 14 are connected. The warm water pipes 14 are passed through slits 27. The branch header 30 is installed obliquely upward and fixed with screws 35. The branch header 40 is caught between a presser plate 46 and the branch header 30. |