摘要 |
PROBLEM TO BE SOLVED: To provide a down pipe support capable of correcting a shift caused in construction.SOLUTION: A down pipe support includes a fixed member 2 and a movable member 3. The fixed member 2 has a fixed part 21 and a fixed-side connection part 22 projected from the fixed part 21 to outside a building 6. The fixed-side connection part 22 has a plurality of recesses as connection recessed parts 22a and projections as connection projection parts 22b alternately in inward/outward directions of the building 6. The movable member 3 has a movable-side connection part 31 connected to the fixed-side connection part 22 using a stopper 4, and a support part 32 where a down pipe 7 is supported. The movable-side connection part 31 has a plurality of connection holes 31a provided in a lateral direction. A connection projection part 22b is inserted into a connection hole 31a, and stoppers 4 are inserted into two connection recessed parts 22a adjoining the connection projection part 22b. The movable member 3 is fixed to the fixed member 2 with the two stoppers 4. |