PROBLEM TO BE SOLVED: To provide an asphalt pavement method that suppresses excess costs and is capable of finishing an asphalt-paved road with embedded facilities in a short construction period.SOLUTION: A road heating pipe 2, which is an embedded facility, is laid on a base course 1, while scattering a load bearing material 3 having a particle diameter R2 larger than a diameter R1 of the road heating pipe 2, and asphalt mixture is spread by rolling over the scattered load bearing material 3 with an asphalt finisher. The road heating pipe 2 laid on the base course 1 is not deformed or damaged by a work load of the asphalt finisher, even if the road heating pipe 2 is not protected by concrete, because the load bearing material 3 functions as a member to withstand the work load of the asphalt finisher. |