发明名称 SYSTEM STABILIZATION SYSTEM
摘要 PROBLEM TO BE SOLVED: To provide a system stabilization system for performing calculation for performing overload protection on the basis of information on a power system after occurrence of an accident.SOLUTION: A system stabilization system comprises: (1) a system information collection unit 2 for collecting system information on a power system; (2) a system model creation unit 3 for creating a prior system model P1 from the collected system information at a constant cycle; (3) an accident detection unit 4a for detecting occurrence of an accident in the power system and removal of the accident; (4) a system model freezing unit 4b for freezing the prior system model P1 created by the system model creation unit in the case of having detected an accident in the power system; (5) a posterior system model creation unit 5c for creating a posterior system model P3 on the basis of the frozen prior system model P2 and information on the power system after removal of the accident; (6) an overload determination unit 6a for determining the presence of an overload location in the power system, on the basis of the posterior system model P3; and (7) a control target selection unit 6b for selecting a control target on the basis of the overload location.
申请公布号 JP2015220869(A) 申请公布日期 2015.12.07
申请号 JP20140102900 申请日期 2014.05.16
申请人 TOSHIBA CORP 发明人 KURATA YUKINA;INOUE YASUNORI;ISHIBASHI SATORU;ISHIHARA YUJI
分类号 H02J3/24;H02J3/00 主分类号 H02J3/24
代理机构 代理人
主权项
地址