摘要 |
The present invention relates to a construction method for a filling material in a modular bridge constructed by an assembly of a plurality of slab modules, and a filling material used for the same. The present invention is to provide the construction method for filling materials capable of constructing a connection unit between the slab modules without installation of additional molds, reducing a construction period by developing compression strength during an early stage of construction, and controlling various types of cracks by prehardening. The construction method for the filling material constructed by the assembly of the plurality of slab modules comprises: (S10) a step of attaching lower and side mold substitute materials to an edge part of one slab module; (S20) a step of pressing the lower and side mold substitute materials while locating an other slab module to be adjacent to the slab module, forming a filling space between the slab module and the other slab module; and (S30) a step of filling the filling material into the filling space. |