发明名称 生産管理装置、工程分析方法および工程分析プログラム
摘要 <P>PROBLEM TO BE SOLVED: To easily compare production planning with actual achievements for every process. <P>SOLUTION: A production management device 10 includes: a storage part 16 that stores an estimated value of a work time of each process included in production planning and an achievement value; and a control part 15 that superimposedly displays a first symbol corresponding to an average value for every process of the estimated values or a first figure, and a second symbol corresponding to an average value for every process of the achievement values or a second figure, on the same scale. The control part 15 may superimposedly display a third symbol corresponding to a range from a minimum value to a maximum value for every process of the achievement values or a third figure for every process, on the same scale. <P>COPYRIGHT: (C)2013,JPO&INPIT
申请公布号 JP5825906(B2) 申请公布日期 2015.12.02
申请号 JP20110165960 申请日期 2011.07.28
申请人 三菱重工業株式会社 发明人 笠野 学;古賀 祐一
分类号 G05B19/418;G06Q50/04 主分类号 G05B19/418
代理机构 代理人
主权项
地址