摘要 |
Disclosed are sand control screens and completion assemblies that receive, retain, and protect control lines during installation and operation thereof. One disclosed completion assembly includes a base pipe, at least one screen jacket positioned around the base pipe and operable to prevent an influx of particulate matter of a predetermined size therethrough, a control line housing arranged uphole from the at least one screen jacket and having a fiber optic splicing block disposed therein, the at least one fiber optic splicing block being communicably coupled to a control line that extends uphole from the control line housing, and one or more hydraulic conduits arranged longitudinally between the at least one screen jacket and the base pipe and extending from the control line housing. |