发明名称 Methods And Apparatus For Planning And Dynamically Updating Sampling Operations While Drilling In A Subterranean Formation
摘要 An example method of planning a sampling while drilling operation for a subterranean formation includes identifying a plurality of processes and related parameters, the processes including drilling and sampling processes and the related parameters including drilling and sampling parameters. The example method also involves processing the parameters for each of the processes via a simulation engine to generate predictions associated with sampling the formation, the simulation engine including at least one of a wellbore hydraulics simulator, a mudcake simulator, a formation flow simulator, or a tool response simulator. The example method also involves ranking the predictions associated with sampling the formation based on at least one of a sample fluid quality, a sampling process duration, a sampling process efficiency or a cost of sampling, and planning the sampling operation based on the ranked predictions.
申请公布号 US2015330218(A1) 申请公布日期 2015.11.19
申请号 US201514807723 申请日期 2015.07.23
申请人 Schlumberger Technology Corporation 发明人 Pop Julian J.;Chang Yong
分类号 E21B49/08;G05B13/04;E21B21/08 主分类号 E21B49/08
代理机构 代理人
主权项 1. A method of controlling a subterranean formation sampling operation, comprising: testing the formation to be sampled; measuring a response of the formation to the testing; determining mudcake and formation parameters based on the response of the formation; processing the mudcake and formation parameters via a simulation engine to generate simulation outputs; determining sampling parameters based on the simulation outputs; and controlling the subterranean formation sampling operation based on the sampling parameters.
地址 Sugar Land TX US