摘要 |
PROBLEM TO BE SOLVED: To provide a connected value chain support system and connected value chain support method capable of maximizing a value produced by connecting a series of production cycles of product development, trial manufacture, mass production, marketing, and termination.SOLUTION: An operation division management system performs production order. A marketing frontal line management system determines the number of productions in a steady time, and directly performs production order based on the determined number of productions to production bases. In a normal case, each base management system assumes supply responsibility, and in an emergency case, the base management system in group leaders in the plurality of base management systems at a plurality of bases of the group, and the operation division management system assume supply responsibility in the group. |