摘要 |
An operation plan correction unit is included which, after start of operation based on an operation plan, predicts a subsequent hot water supply load at a predetermined day on the basis of a hot water supply load result at the predetermined day, and changes a subsequent operation plan at the predetermined day generated by an operation plan generation unit, on the basis of the hot water supply load predicted again and a remaining amount of stored hot water in a hot water storage tank. |