发明名称 |
System, method and computer readable medium for using performance indicators and predictive analysis for setting manufacturing equipment parameters |
摘要 |
The method includes receiving first data from an in-memory computing module, the data including performance indicators, receiving second data from a enterprise resource planning database, predicting a target time per piece based on the first data and the second data, predicting a target cost per piece based on the first data and the second data, and setting an equipment speed based on the target time per piece and/or the target cost per piece. |
申请公布号 |
US9189760(B2) |
申请公布日期 |
2015.11.17 |
申请号 |
US201213680602 |
申请日期 |
2012.11.19 |
申请人 |
SAP SE |
发明人 |
Tanna Jemin;Mohnani Jiten Kumar |
分类号 |
G06F19/00;G06F7/00;G06F15/16;G06F21/00;G06F13/00;G06F17/30;G06F12/00;G06Q50/00;G06Q10/00;G06Q30/00;H04N7/10;H04N7/173;G06F13/28;G06Q10/06;G06Q10/04;G06Q50/04 |
主分类号 |
G06F19/00 |
代理机构 |
Brake Hughes Bellermann LLP |
代理人 |
Brake Hughes Bellermann LLP |
主权项 |
1. A method comprising:
receiving first data from a data warehouse by an in-memory computing module, the first data including performance indicators associated with other equipment in a manufacturing process utilizing an equipment, the in-memory computing module being configured to store the first data in random access memory (RAM) and to process operational and transactional data in real-time; receiving second data, by the in-memory computing module, from an enterprise resource planning database, the second data including information including at least one of bill of material information, machine set-up information, tool information, and maintenance information associated with the other equipment in the manufacturing process utilizing the equipment; predicting, by the in-memory computing module, a target time per piece based on the first data and the second data, wherein predicting the target time per piece includes determining the equipment speed over which a time per piece is minimized in order to minimize a time associated with the manufacturing process based on the performance indicators and the information; and setting an equipment speed based on the target time per piece. |
地址 |
Walldorf DE US |