摘要 |
PROBLEM TO BE SOLVED: To provide a construction method of a concrete structure for restraining exfoliation of an adhesive layer formed on a surface of concrete, while simplifying the construction method.SOLUTION: A construction method comprises: a process of placing concrete 10 on the inside of a form in a state that a spacer 2 for holding an interval of the form and a connector member 3 connected to an end part of the spacer 2 are provided, a fastening bolt 4 inserted into a hole of the connector member 3 is inserted into the form and projects to the outside of the form, and a nut is fastened from the outside of the form to the fastening bolt 4; a process of removing the form after hardening the concrete 10, forming an adhesive layer 11 on a surface of concrete 10 in a state that a projection 4 projecting from the surface of the concrete 10 is inserted into the hole of the connector member 3, and projecting the projection 4 from the adhesive layer 11; and a process of forming a finish layer on the outside of the adhesive layer 11 and a locking member after pressing the adhesive layer 11 by a collar part of the locking member whose shaft part is inserted into the hole of the connector member 3. |