摘要 |
<p><P>PROBLEM TO BE SOLVED: To provide a soil improvement construction method excellent in lessening of excessive supply of mineral to surrounding animals and plants from fill formed of a soil improvement material containing iron and steel slag and soil. <P>SOLUTION: Water flowing down from fill formed of a soil improvement material containing iron and steel slag and soil is passed through an ion-exchange substance. A water channel or an impervious layer, or both of them is or are provided to prevent rainwater and sump water from the ground from permeating the fill. Consequently, excessive supply of mineral is lessened. <P>COPYRIGHT: (C)2013,JPO&INPIT</p> |