发明名称 山留め壁の構築方法
摘要 <p><P>PROBLEM TO BE SOLVED: To provide a method for constructing an earth retaining wall and a structure for the same, which can solve the problem of the conventional method for constructing an earth retaining wall in which the earth retaining wall is a double structure, leading to longer construction period and higher cost. <P>SOLUTION: In a method for constructing an earth retaining wall, a soft ground is bored by the deep layer mixture treatment method and a solidification material slurry 1b is injected, agitated and mixed at an original position, and before the agitated and mixed soil cement in the bored hole is solidified, a reinforcement core material 5 is inserted into the bored hole so as to construct an earth retaining wall for the soft ground. <P>COPYRIGHT: (C)2013,JPO&INPIT</p>
申请公布号 JP5808153(B2) 申请公布日期 2015.11.10
申请号 JP20110121727 申请日期 2011.05.31
申请人 发明人
分类号 E02D5/20 主分类号 E02D5/20
代理机构 代理人
主权项
地址