发明名称 Method and device for zonal isolation and management of recovery of horizontal well drained reserves
摘要 The invention relates to the oil and gas production industry, in particular, to development and production of oil reservoirs with various permeability zones, specifically, with lateral/lateral horizontal holes, drilled from the production casing. The method described includes running into the well of a tubing string with a cable, control devices in form of electrical valves, measurement pressure and temperature sensors, and one or more packers for isolation of the downhole space, in which information from the sensors is passed to the measurement unit at the wellhead, and signals for opening/closing of the control devices are transferred from the wellhead control unit by the cable. A device for carrying out this method is also described.
申请公布号 US9181774(B2) 申请公布日期 2015.11.10
申请号 US201313732507 申请日期 2013.01.02
申请人 OTKRYTOE AKTSIONERNOE OBSCHESTVO “TATNEFT” IM. V.D.SHASHINA 发明人 Khisamov Rais Salikhovich;Nuriev Iliyas Akhmatgalievich;Abdrakhmanov Gabdrashit Sultanovlch;Iktisanov Valery Askhatovich;Vakhitov Ilshat Damirovich;Nizamov Ilkham Gadnanovich;Khamitiyanov Nigamatyan Khamitovich;Korzhenevsky Arnold Gennadievich;Bagnyuk Sergei Leonidovich;Filippov Vitaly Petrovich;Mironova Lyubov Mikhailovna;Korzhenevsky Andrei Arnoldovich
分类号 E21B43/14;E21B33/13;E21B43/12;E21B47/12 主分类号 E21B43/14
代理机构 Ladas & Parry LLP 代理人 Ladas & Parry LLP
主权项 1. A method for zonal isolation and management of recovery of reserves from a horizontal well comprising a wellhead, a vertical section and a horizontal section, the horizontal section passing through a formation with a multiplicity of permeability zones, including a plurality of separated first zones each having approximately the same permeability as each other and a plurality of separated second zones each having approximately the same permeability as each other and a different permeability than each of the plurality of first zones, the method comprising running into the well a tubing string with a cable, first and second control devices comprising respective valves and a plurality of measurement sensors, a pump, a plurality of packers and a plurality of conduits such that: (a) the plurality of packers are disposed in the horizontal section separating the multiplicity of permeability zones from each other with each of the plurality of separated first zones connected to each other with a first of the plurality of conduits for delivery of a first stream comprising reserves from each of the plurality of first zones, and with each of the plurality of separated second zones connected to each other with a second of the plurality of conduits for delivery of a second stream comprising reserves from each of the plurality of second zones; (b) the first and second control devices are positioned in the vertical section of the well one above the other with an inlet of the first control device in fluid communication with the first stream and an inlet of the second control device in fluid communication with the second stream and with respective outlets of the first and second control devices operationally connected to an inlet of the pump such that the pump can pump to the wellhead either reserves from the first stream through the first control device or reserves from the second stream through the second control device; and (c) the measurement sensors can transmit data to the wellhead and the cable can transmit signals from the wellhead to the respective first and second control devices to control opening and closing of the respective valves of the first and second control devices whereby to control whether reserves from the first or second stream are pumped to the wellhead based upon data transmitted from the measurement sensors.
地址 Tatarstan, Almetievsk RU