发明名称 INCORPORATING A LOAD CHANGE PENALTY IN CENTRAL PLANT OPTIMIZATION
摘要 An optimization system for a central plant includes a processing circuit configured to receive load prediction data indicating building energy loads and utility rate data indicating a price of one or more resources consumed by equipment of the central plant to serve the building energy loads. The optimization system includes a high level optimization module configured to generate an objective function that expresses a total monetary cost of operating the central plant over the optimization period as a function of the utility rate data and an amount of the one or more resources consumed by multiple groups of the central plant equipment. The optimization system includes a load change penalty module configured to modify the objective function to account for a load change penalty resulting from a change in an amount of the building energy loads assigned to one or more of the groups of central plant equipment.
申请公布号 US2015316946(A1) 申请公布日期 2015.11.05
申请号 US201514634573 申请日期 2015.02.27
申请人 Johnson Controls Technology Company 发明人 Wenzel Michael J.;Turney Robert D.
分类号 G05F1/66;G05B13/02 主分类号 G05F1/66
代理机构 代理人
主权项 1. An optimization system for a central plant configured to serve building energy loads, the optimization system comprising: a processing circuit configured to receive load prediction data indicating building energy loads for a plurality of time steps in an optimization period and utility rate data indicating a price of one or more resources consumed by equipment of the central plant to serve the building energy loads at each of the plurality of time steps; a high level optimization module configured to generate an objective function that expresses a total monetary cost of operating the central plant over the optimization period as a function of the utility rate data and an amount of the one or more resources consumed by multiple groups of the central plant equipment at each of the plurality of time steps; wherein the high level optimization module is configured to optimize the objective function over the optimization period subject to a set of constraints to determine an optimal amount of the building energy loads assigned to each of the groups of central plant equipment at each of the plurality of time steps; and a load change penalty module configured to modify the objective function to account for a load change penalty resulting from a change in the amount of the building energy loads assigned to one or more of the groups of central plant equipment.
地址 Holland MI US