摘要 |
The present invention refers to a tunnel-type coke furnace with a movable sliding bed and the method of using the same, wherein the furnace comprises a furnace body (48), a front sealing door (7), a back sealing door (25), a branch flue (10), a bottom flue (12) and a main flue (6), and also comprises a first preparation chamber (3) for coaling, a preheating segment (50), a carbonization segment (51), a coke dry quenching segment (52), and a second preparation chamber (23) for coke outlet, wherein each part has different formation from the others, and these parts are interconnected in series with the others, wherein the sliding bed (37) for coaling and tamping coal material (44) passes through the abovementioned five parts in series in order to coke. The invention may realize a production coal material with fixed formation through formation process with pressure, and also to obtain the coke product with the relatively big size, fixed formation and high strength, and to achieve high utilization rate of heat energy, high degree of mechanization and the clean exhaustion of flue, so as to be able to protect the environment and water resource, and realize clean production. |