摘要 |
<p><P>PROBLEM TO BE SOLVED: To sufficiently demonstrate the heat exchange performance of an adsorption heat exchanger upon dehumidifying operation while preventing freezing of water in the adsorption heat exchanger during a humidifying operation in a humidity controller including the adsorption heat exchanger. <P>SOLUTION: The humidity controller alternately and repeatedly performs a first operation in which a first adsorption heat exchanger 51 is a condenser and a second adsorption heat exchanger 52 is an evaporator and a second operation in which the second adsorption heat exchanger 52 is the condenser and the first adsorption heat exchanger 51 is the evaporator. In the humidity controller which performs the humidifying operation, in both of the first operation and the second operation, air flows from the inflow side to the outflow side of a refrigerant in the respective adsorption heat exchangers 51 and 52. On the other hand, in the humidity controller which performs the dehumidifying operation, in both of the first operation and the second operation, the air flows from the outflow side to the inflow side of the refrigerant in the respective adsorption heat exchangers 51 and 52. <P>COPYRIGHT: (C)2013,JPO&INPIT</p> |