发明名称 AUTOMATIC TRAIN OPERATION SYSTEM, TRAIN OPERATION SUPPORT SYSTEM, AND TRAIN SERVICE MANAGEMENT SYSTEM
摘要 PROBLEM TO BE SOLVED: To adjust a start timing of a train to be controlled in accordance with an influx of users at a departure station for the train to be controlled.SOLUTION: An automatic train operation system includes departure time control means for reflecting a corrected departure time by correcting a planned departure time of a train to be controlled from a preset planned departure time of the train to be controlled and detection information on the influx of station users at a predetermined measuring point, and generating the corrected departure time in a plan of travel between stations. The departure time control means includes means for measuring the number of users for measuring the number of users heading for a getting-on platform at a measuring point before the getting-on platform for the train to be controlled, movement time estimation means for estimating a required movement time from the measuring point to the getting-on platform, the number of users bottoming-out time determination means for determining the time when the number of people per unit time flowing in the getting-on platform bottoms out, and departure time correction means for comparing the bottoming-out time with the planned departure time of the train and correcting the departure time.
申请公布号 JP2015182623(A) 申请公布日期 2015.10.22
申请号 JP20140061289 申请日期 2014.03.25
申请人 HITACHI LTD 发明人 MAKI KENTARO;MIYAUCHI TSUTOMU;OMURA MASASHI
分类号 B61L27/00;B60L15/40;G06Q50/30;G07B5/00;G07B15/00 主分类号 B61L27/00
代理机构 代理人
主权项
地址