发明名称 |
AUTOMATIC TRAIN OPERATION SYSTEM, TRAIN OPERATION SUPPORT SYSTEM, AND TRAIN SERVICE MANAGEMENT SYSTEM |
摘要 |
PROBLEM TO BE SOLVED: To adjust a start timing of a train to be controlled in accordance with an influx of users at a departure station for the train to be controlled.SOLUTION: An automatic train operation system includes departure time control means for reflecting a corrected departure time by correcting a planned departure time of a train to be controlled from a preset planned departure time of the train to be controlled and detection information on the influx of station users at a predetermined measuring point, and generating the corrected departure time in a plan of travel between stations. The departure time control means includes means for measuring the number of users for measuring the number of users heading for a getting-on platform at a measuring point before the getting-on platform for the train to be controlled, movement time estimation means for estimating a required movement time from the measuring point to the getting-on platform, the number of users bottoming-out time determination means for determining the time when the number of people per unit time flowing in the getting-on platform bottoms out, and departure time correction means for comparing the bottoming-out time with the planned departure time of the train and correcting the departure time. |
申请公布号 |
JP2015182623(A) |
申请公布日期 |
2015.10.22 |
申请号 |
JP20140061289 |
申请日期 |
2014.03.25 |
申请人 |
HITACHI LTD |
发明人 |
MAKI KENTARO;MIYAUCHI TSUTOMU;OMURA MASASHI |
分类号 |
B61L27/00;B60L15/40;G06Q50/30;G07B5/00;G07B15/00 |
主分类号 |
B61L27/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|