发明名称 |
Communication Device for Handling Uplink Power Control |
摘要 |
A communication device for handling uplink power control comprises the instructions comprise determining a power level of a first uplink (UL) subframe of a first base station and a first power level of a second UL subframe of a second base station according to an initial power level of the first UL subframe and an initial power level of the second UL subframe, wherein a starting boundary of the second UL subframe is within the first UL subframe; and determining a second power level of the second UL subframe of the second base station and a first power level of a third UL subframe of the first base station according to the first power level of the second UL subframe and an initial power level of the third UL subframe, wherein a starting boundary of the third UL subframe is within the second UL subframe. |
申请公布号 |
US2015304958(A1) |
申请公布日期 |
2015.10.22 |
申请号 |
US201514687920 |
申请日期 |
2015.04.16 |
申请人 |
HTC Corporation |
发明人 |
Wu Chih-Yao;Meng Ling-San |
分类号 |
H04W52/14;H04W52/24;H04W52/16 |
主分类号 |
H04W52/14 |
代理机构 |
|
代理人 |
|
主权项 |
1. A communication device for handling uplink power control configured to communicate with a first base station and a second base station, comprising:
a storage unit for storing instructions of: determining a power level of a first uplink (UL) subframe of the first base station and a first power level of a second UL subframe of the second base station according to an initial power level of the first UL subframe and an initial power level of the second UL subframe, wherein a starting boundary of the second UL subframe is within the first UL subframe; performing a first UL transmission with the first base station in the first UL subframe according to the power level of the first UL subframe; determining a second power level of the second UL subframe of the second base station and a first power level of a third UL subframe of the first base station according to the first power level of the second UL subframe and an initial power level of the third UL subframe, wherein a starting boundary of the third UL subframe is within the second UL subframe; and performing a second UL transmission with the second base station in the second UL subframe according to the second power level of the second UL subframe; and a processing means, coupled to the storage unit, configured to execute the instructions stored in the storage unit. |
地址 |
Taoyuan City TW |