发明名称 |
BOOST CONVERTER CONTROL APPARATUS |
摘要 |
The present invention prevent a shortage of the output when an intermittent boost is executed. A control apparatus for controlling a boost converter that can boost power supply voltage by boost control has: an intermittent controlling device for executing the intermittent boosting in such a manner that output voltage is maintained in a voltage variation allowable range including a target value on the basis of the detected output voltage of the boost converter; an average value calculating device for calculating an average value of the output voltage in an execution period of the intermittent boosting; and a target value correcting device for correcting the set target value to increase it when the calculated average value is less than the target value and is less than a required voltage value of a loading apparatus. |
申请公布号 |
US2015303798(A1) |
申请公布日期 |
2015.10.22 |
申请号 |
US201214440415 |
申请日期 |
2012.11.13 |
申请人 |
TOYOTA JIDOSHA KABUSHIKI KAISHA |
发明人 |
Okamura Masaki;Takamatsu Naoyoshi;Hanada Hideto;Yamada Kenji;Hirano Kosuke |
分类号 |
H02M3/157 |
主分类号 |
H02M3/157 |
代理机构 |
|
代理人 |
|
主权项 |
1. A boost converter control apparatus which is configured to control a boost converter in a power supply system,
the power supply system comprising: a DC (direct current) power supply having power supply voltage; the boost converter including a switching device, the boost converter being configured to boost and output the power supply voltage to a loading apparatus by boost control including switching of a switching state of the switching device according to a target value; and a voltage sensor which is configured to detect output voltage of the boost converter, the boost converter control apparatus comprising a controller, the controller being configured to: execute an intermittent process of the boost control in such a manner that the output voltage is maintained in a predetermined range including the target value, on the basis of the detected output voltage; calculate an average value of the output voltage in an execution period of the intermittent process; and correcting correct the target value to increase the target value when the calculated average value is less than the target value and is less than a required voltage value of the loading apparatus. |
地址 |
Toyota-shi, Aichi-ken JP |