发明名称 壁面構築方法
摘要 <p><P>PROBLEM TO BE SOLVED: To solve the problem that, conventionally, bolt holes or connection holes of upper and lower panels are not aligned with each other and the panels cannot be connected if positional relation between the upper and lower panels deviates when the panels are stacked. <P>SOLUTION: In a first step, a panel body 1a of an upper stage is inserted and positioned between a front face connection member 2a, of which one end is attached to a panel body 1a of a lower stage and of which the other end projects upward from a front side and a back side of the panel body 1a of the lower stage, and a back face connection member 3a. In a second step, a bolt 4c is interposed in a prescribed interval 19, 17 between the front face or back face of the panel body 1a of the upper or lower stage and an engaging face 2a1, 3a1 of the front face connection member 2a or the back face connection member 3a. Then, the panel bodies 1a are fixed and stacked, and thereby the upper and lower panel bodies 1a can be mutually supported at a desired position in a laying extension direction. <P>COPYRIGHT: (C)2013,JPO&INPIT</p>
申请公布号 JP5796997(B2) 申请公布日期 2015.10.21
申请号 JP20110101330 申请日期 2011.04.28
申请人 发明人
分类号 E02D29/02;E02D17/18;E21D11/10 主分类号 E02D29/02
代理机构 代理人
主权项
地址