摘要 |
<p>An operation plan decision method includes deriving an feasible solution by using a constraint violation minimization model, updating candidates for an optimum solution and adding the updated candidates to a candidate list by taking the derived feasible solution, as an initial value of a candidate for the optimum solution, and by using a time cross-section division model that is obtained by dividing an optimization model for each time cross-section, and selecting the optimum solution from the candidate list to which the updated candidates are added.</p> |