摘要 |
<p>The present invention relates to a method for building a ship exceeding the length of a pontoon deck of a floating dock, capable of building a ship even through a bow part protrudes out of the range of the pontoon deck by securing the welding space of the bow part in the pontoon deck by moving a ship body welded with a stern in a stern direction on the pontoon deck. The method for building a ship exceeding the length of the pontoon deck of the floating dock according to one desirable embodiment of the present invention launches the completed ship by welding the bow part on the ship body welded with the stern on the pontoon deck of the floating dock. The method for building a ship exceeding the length of the pontoon deck of the floating dock includes a first step of locating the completely welded stern of the ship body on one end of the pontoon deck of the floating dock to be matched, a second step of securing the welding space of the bow part of the ship by protruding the ship body with the stern matched on one end of the pontoon deck in a stern direction, a third step of welding a large block with the ship body by receiving the assembled large block in the secured space of the pontoon deck by the second step, a fourth step of forming the bow part of the ship body by performing a welding operating after a small block is mounted on the large block welded with the ship body by the third step, and a fifth step of sinking the pontoon deck by injecting water into the floating dock to launch the completed ship body by the fourth step.</p> |