发明名称 BOOST CONVERTER CONTROL APPARATUS
摘要 The present invention minimizes system loss during execution of intermittent boosting. A boost converter control apparatus has: a target value setting device for setting a target value of output voltage that minimizes a loss of a power supply system including a DC power supply, a boost converter, and a loading apparatus; an intermittent controlling device for executing an intermittent process of boost control in such a manner that the output voltage is maintained in a range including the set target value; an average value calculating device for calculating an average value of the output voltage in an execution period of the intermittent process; and a target value correcting device for correcting the set target value to reduce a deviation between the calculated average value and the set target value.
申请公布号 US2015280565(A1) 申请公布日期 2015.10.01
申请号 US201214441938 申请日期 2012.11.13
申请人 TOYOTA JIDOSHA KABUSHIKI KAISHA 发明人 Okamura Masaki;Takamatsu Naoyoshi;Hanada Hideto;Yamada Kenji;Hirano Kosuke
分类号 H02M3/158;B60L11/08 主分类号 H02M3/158
代理机构 代理人
主权项 1. A boost converter control apparatus which is configured to control a boost converter in a power supply system, the power supply system comprising: a DC (direct current) power supply having power supply voltage; the boost converter including a switching device, the boost converter being configured to boost and output the power supply voltage to a loading apparatus by predetermined boost control including switching of a switching state of the switching device; and a voltage sensor which is configured to detect output voltage of the boost converter, the boost converter control apparatus comprising a controller, the controller being configured to: set a target value of the output voltage that minimizes a loss of the power supply system including the DC power supply, the boost converter, and the loading apparatus; execute an intermittent process of the boost control in such a manner that the output voltage is maintained in a range including the target value which is set when the boost control is executed immediately before, on the basis of the detected output voltage; calculate an average value of the output voltage in an execution period of the intermittent process; and correct the set target value to reduce a deviation between the calculated average value and the set target value.
地址 Toyota-shi, Aichi-ken JP