发明名称 METHOD FOR CONTROLLING THE BALLAST SUPPLY DURING RENOVATION OF A BALLAST BED
摘要 During renovation of a ballast bed of a track, old bulk material (6) to be removed is stored on a number of storage wagons (2), forming a track construction site (10), said storage wagons being connected to form a loading train (7). In parallel to this, new bulk material (9) is introduced into the track construction site (10), said new bulk material being pre-stored on a number of storage wagons (2), which are connected to form a loading train (8). The introduction of the new bulk material (9) into the track construction site (10) is controlled automatically depending on a volume of the old bulk material (6) removed from the track construction site (10).
申请公布号 WO2015144280(A1) 申请公布日期 2015.10.01
申请号 WO2015EP00418 申请日期 2015.02.24
申请人 PLASSER & THEURER EXPORT VON BAHNBAUMASCHINEN GESELLSCHAFT M.B.H. 发明人 WÖRGÖTTER, HERBERT
分类号 B65G65/30;E01B27/02 主分类号 B65G65/30