发明名称 GAS TURBINE INSTALLATION
摘要 PROBLEM TO BE SOLVED: To provide a gas turbine power generation system capable of attaining high output and high efficiency under a condition of reducing a supply water quantity, by reducing a design change in a gas turbine. SOLUTION: A fine droplet sprayer 11 is arranged in an upstream side intake chamber 22 of an air compressor 2, and a humidifier 7 is arranged for humidifying high pressure air coming out of the compressor 2. A regenerator 5 is arranged for heating the humidified air with gas turbine exhaust gas as a heat source. Thus, there are the motive power reducing effect of the compressor 2 and the output increasing effect by humidification of combustion air 20, and since the quantity of fuel being used can be reduced by adopting a regenerating cycle, power generation efficiency is improved. COPYRIGHT: (C)2006,JPO&NCIPI
申请公布号 JP2006226293(A) 申请公布日期 2006.08.31
申请号 JP20060107287 申请日期 2006.04.10
申请人 HITACHI LTD 发明人 HATAMIYA SHIGEO;YAMAGISHI MASAHIKO;YOKOMIZO OSAMU;NOGUCHI YOSHIKI;TSUKAMOTO MORIAKI
分类号 F02C3/30;F01D25/32;F02C6/18;F02C7/08;F02C7/141 主分类号 F02C3/30
代理机构 代理人
主权项
地址
您可能感兴趣的专利