摘要 |
PROBLEM TO BE SOLVED: To facilitate the infilling work of a mold, which is performed as part of the greening of a slope. SOLUTION: This infilling method for the mold is practiced for the greening of the slope (10) where the mold (12) is installed. The filling method comprises a step of fitting one or more blocks (16), for filling a square (20) of the mold, into the square (20) of the mold. The plurality of blocks (16) can be stacked in a plurality of steps. COPYRIGHT: (C)2006,JPO&NCIPI
|